Dear concern person his proper formula or proper pattern is only bar bending schedule of steel (BBS of reinforcement) of respectively Column, beam and slab.
But his some many coefficient is follow up.
1. Column - 0.3 MT/ Cum of concrete volume.
2. Beam - 0.15 MT / Cum of concrete volume.
3. Slab - 0.12 MT / Cum of concrete volume.
If any quarry in technical or building construction question,then please contact my Email Id.
Sincerely.
From,
Mr. Ajay Kumar Singh
ajay_singh1967@rediffmail.com
| Is This Answer Correct ? | 13 Yes | 6 No |
Post New Answer View All Answers
What is meant by scaffolding coefficient?
afe or not
five benefits of using standard terminology in the measurement process
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
very simple or less time consuming formula for reinforcement calculation by moment
How does siphoning work?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
is concealed wiring a problem in fly ash brick wall?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
What is semirigid connections?
how to estimate material requirement for an area of house in square feet?
Draw the cross section of a boundary wall and label its part with detailing?
In cement making,what is meaning of blend,fineness,density.