how to calculate the steel for rcc slab?
plz tell me the formula for calculating the steel?
Answer Posted / mr. ajay kumar singh
Dear concern person his proper formula or proper pattern is only bar bending schedule of steel (BBS of reinforcement) of respectively Column, beam and slab.
But his some many coefficient is follow up.
1. Column - 0.3 MT/ Cum of concrete volume.
2. Beam - 0.15 MT / Cum of concrete volume.
3. Slab - 0.12 MT / Cum of concrete volume.
If any quarry in technical or building construction question,then please contact my Email Id.
Sincerely.
From,
Mr. Ajay Kumar Singh
ajay_singh1967@rediffmail.com
| Is This Answer Correct ? | 13 Yes | 6 No |
Post New Answer View All Answers
How to design staircase.plz tell me formula for the design the staircase.
what does the grad of cement shows (denotes)?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
door and window wood work calculations and different methods
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
Explain different types of rcc pipes.
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
how many types of survey and what are levelling instrument?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
WHAT DLC DESIGN IN CONSTRUCTION
procedure for preliminary selection of size of column of 5 storey building