Answer Posted / m.selvam
Cut length of the Fe500 dia bar is
CL=(0.8L)+(2*(0.25*L))
L=length of the member or beam or column or slab
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is the function of GSB all class ?
Process of pcc in wateredug
Explain what is Hybrid Foundation?
Aptitude, reasoning, quants, verbal and technical question
How many square meter can a worker/labor demolish a structure per day?
how we check the thickness and line of ceiling plaster.
How to calculate laplength for 3 floors
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
plumbing CPVC fitting FTE Brass full form
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
Mention what are the composition of a landfill?
what are RIB slabs explain about it
What is the difference between linear dimension and aligned dimension?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.