why we do multiply 1.54 for dry volume of concrete?

Answer Posted / afridi

cuz there is water in concrete and for dry volume we
multiply 1.54.

Is This Answer Correct ?    10 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you

2145


silt%= silt volume/ silt+sand volume is this right?

1657


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

2499


how much repeitation for conventional and maivan formwork?

1708


WHAT DLC DESIGN IN CONSTRUCTION

1780






what is the clear cover for shearwall?

1211


What are the advantages of cad software?

796


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2428


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1367


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

2534


What is the zero value in quantity surveying

2151


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1289


What is difference between combin footing & rapt footing

1310


Why is concrete cube test carried out?

920


What are the problems one might face while having a Cantilever balcony?

1218