What is Difference Between Induction Motor & Servo Motor
Answer Posted / sumit pandey
1. servo motors have in built encoders which servers as
reference for speed to the drive used with servo forming
closed loop while induction motors can use external
encoders.
2.servo motors have high starting torque & low inertia
while induction motors have low starting torque & high
inertia. so, accuracy is much higher in servo motors as in
comparison with induction motors.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
During regenerative breaking= A rotating magnetic field is reversed B slip is positive C torque is positive D slip is negative
what is mean by dry frequency
Why the magneti fields are not passes from southpole to north pole
What is purpose of reactor?.What is different between line and bus reactor?
i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected
what are factors to be consider to design a HT & LT motor?
when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//
what is the function of capacitor duty contactor in an capacitor panel???
What is clock position of Transformer?what are the clock positions are there?and what is different of them?
what is the difference between droop mode and ischnorous mode in thermal powerplant?
What are the symptoms of a bad PG card of a drive (inverter) esp. of Yaskawa Ac Drives (inverters) G7 ?
Iwould like to know barc interview questions
is IS says that neutral should be brought to switch box. and this one is a recomended practice
What is meant by Low Resistance Cable and High Resistance Cable.
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,