Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is a moisture correction

Answer Posted / arun

It is the correction or change of water/moisture presented
in material with reference to the SSD Condition.

Mostly used in Concrete/RMC Plant for maintain the
water-cement ratio have been decided during the design.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Volume of 25kg putty bag & 40 kg putty bag volume??

2060


What is the release of lien?

1183


can you provide a link for manual design of building?

1561


Where will be the maximum bending moment in a TEE Beam?

7557


Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?

1882


what do you know that m20,m25

1896


What is kn measurement?

1274


CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

2163


Explain the difference between shear and tensile strength.

1096


why are you joining in this (applied post) job and your aim for this job

2669


how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches

1634


03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1

2276


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2087


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

2109


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2854