Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate width and thickness of columns and beams
for differnt area with example

Answer Posted / sjtbehera

ok it depends upon the desigin of the load and distribution
of load. example- the column of the buildg. first load is
calculated then it distrubuted on to columns

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to prepare site mix design

2005


what radial pressure, the NP2 class rcc pipe can sustain?

3481


B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

3007


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

2005


what is the effect of duration of earth quake on framed structures ?

2294


how do you calaculate the total steel quantity of an rcc building using thumb rule?

3749


What is the substitute of Mastic Asphalt?

8212


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

2369


What is the Unit weight of coarse sand (F.M- 2.20) ?????

2014


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2852


what are the values of compressieve strenght?

2106


what is the meaning of degreasing of the euipment or line.

4148


Define polar co ordinates.

1271


Specific gravity of cement?

1706


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2914