5P means actually the %error in the secondary of CT.
PS(purchaser specification) means, it is a special CT .
normally it is indicated like this EX : 5P20 means 20 times
of the over current the core will be saturated.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
how to calculate percentage impedence at 75 deg C at normal tap
How PSV sizing being done
what is the difference between online & offline caliberation of KWH meters. Can Digital meters be caliberated
If the Brush of DC motor is shifted by 90 deg, then what happens to voltage and torque? Both voltage and torque are zero. how to justify the answer?
what is the effect of vector group while phase sequence of a generator changes,whether the vector group changes or not
THERMAL CAPACITANCE IS MEASURED IN..................................................
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
How to reduce the static electricity producing in solvent room? By P.D.Patil BioCon
Why does the adjacent zone of protection overlap?
What is the relation between frequency and motor rpm?
What are unstable systems?
what may the reason for vector shift in a generator?
During regenerative breaking= A rotating magnetic field is reversed B slip is positive C torque is positive D slip is negative
what is the size of cable for 15kw motor and 85 meter cable length using with vfd
area control error