Answer Posted / parthasarathi
5P means actually the %error in the secondary of CT.
PS(purchaser specification) means, it is a special CT .
normally it is indicated like this EX : 5P20 means 20 times
of the over current the core will be saturated.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
Draw a SLD of HT distribution EB grid up to users Transformer?
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
What should be the amps for a MV fuses for transformer 630kVA 20(10)/0.4 kV
use of PIR in ehv breaker
What are the two basic types of transformers?
why incomer bay is required before transformer bay if there are more than 1 nos. of transformer bay.
What do you understand by oldham's coupling ?
what happen if drive input fail momentry at 48.5 HZ frequency?
hi pal, i am vengatesh from tamilnadu(chidambaram),i have called for the written test for the post of jr executive(ELECTRICAL) of AAI ,I dont know about the question paper pattern,so any kindly help me to face the examination,post me the model question papers and some tips to write my examination to (vengi.annadurai@gmail.com)
For overhead protection we use which transformer?
which cable is used for 15 Hp monoblock pump 3phase and service wire Distance is 210 feet please tell me cable size Armaured
Define relative stability.
Mention what are the types of semi-conductors?
Why does the rotor rotate?
why we permissive overreach in distance protection.where it is applicable to use in long r short lines