What should be the size (Cubic meter) of a water tank for
1000 Ltrs. capacity?

Answer Posted / lokender singh

1mX1mX1m

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which is the best book for building construction?

661


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2059


Which is the direction of negative angle?

637


for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band

1413


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2137






As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1497


What is Architect-Prepared Contract?

738


If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

1914


what is the mode of method of face bar measurement

2065


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2037


what is total volume of ingredients used in concrete accordingly

1813


Civil engineering material testing Standard results

1874


Explain what is the release of lien?

669


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

2861


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1649