Answer Posted / elsayem
datum point is the rerence point when we measure level
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the procedure of calibration of Load cell?
why use 50% lel methane gas concentration for gas detector calibration instead of 60% lel gas concentration whereas the hi alarm set at 60% lel.
If fire would be inside the plant which fire detector is to detected the fire.
what deference between panel earth and systemearth
what is orfics working in main steam line. is it increase pressure, velocity of steam flow and dicrease steam flow rate. or any other
can any one explain in which term we are flow flow is it volumetric r is it mass? and y
NPN transistor, SCR, Zener diode, LED, Varactor diode, Vortex meter, RTD, Resistor, Crystal
in valve is constructed as per SME B 16.34, then which standard is used for fire testing of valve?.
1. For Steam drum level signal, why do we compensate with drum pressure signal? 2.For main steam Flow signal is comensated with main steam temperature signal and main steam pressure signal why?
How is automatic reference junction compensation carried out in temperature recorders?
hye SAM acn u send your e mail id, so that i can solve my query through e mail?
why direct mounted pressure transmitters is always installed with DBB ( double bleed block) valve in process line or top of the tanks ?
what is SIL 1 2 3
Tell me the field calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter.
What denotes the 5/8mm in the 3300XL 5/8mm proximitor probe?