why expansion bellow is provided in between hopper and vessel
in ash handling plant?
Answer Posted / jitendra sharma
The purpose of expansion below is to provide isolation from
vibrators which are mounted on the surface of the vessel.
Their are several no's of vibrators, to remove the fly ash
contents before it's temperature decreases to prevent
solidification of fly ash on the walls of vessel.
All u know that we remove the fly ash from boiler tubes and
APH with help of soot blowing.
Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
operation
What is difference between secondary Air & Tertiary Air and Their use.?
what is the difference between compensated & normal drum level in boiler drum?
what is natural frequency of turbine shaft .
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
explain how the third harmonic content of the magnetising current affects transformer design
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
Why superheated are started before I'd and rd fan?
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
can dp type level transmitter work in under vaccum condition
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
what is the meaning of SST300 V56A in SIEMENS turbine
procedure of how to generate power in solar plant.