How much kilogram of binding wire required for fabricate
one Metric ton of reinforcing steel
Answer Posted / maulik tripathi
6mm TO 12mm = 10KG
16mm To 25mm = 6KG
32mm To 50mm =4 KG
And also calculate 5% of wastage.
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
What is the best type of wood glue?
How to calculate brick work quantity?? Block work quantity??
How to arrive dry volume of concrete (1.52 to 1.57) ?
difference between fc and fc'?
How do you calculate the power of a centrifugal pump?
what could be the production cost of 1 cum of concrete by CP30 plant
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
how clculate excavated or backfilling quantity by simpson's rule
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
What are the ingredients of pre-stressed concrete?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
rate analysis for cement pointing 1:4 , for 100 sq m
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
what is modular brick and it size