what is the difference between main meter CT and check
meter CT?and what is the difference between main meter PT
and check meter PT?

Answer Posted / k.c.bhanu

In an industry the main meter CT's ( highly insulated as
per High voltage standard)primary windings are connected
directly to HT voltage(11KV/33KV)& secondary winding to the
Trivectometer. the check mteres & its CTs are commonly
installed with LT/ low voltage system of Consumer.
The Main PT (HT side) are designed 11KV/110volts or
33KV/110volts the primary windings are connected to the
High voltage & the secodary windigs out put (110 volts)are
connected to the Trivectometer.

Is This Answer Correct ?    10 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is a difference between indoor transformer and outdoor transformer of same rating

5327


Is it acceptable of installing an earth pit in planters area where bare copper cable, earth rod and connection are susceptible to corrosion due to water?

1576


We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.

1699


how can I calculate charging current of cable/overhead conductor? what is roll of voltage in it ?

3312


why actual valve timing diagram is different than ideal valve timing digram of a 4 stroke engine?

5162






Can you tell me more about pu systems (per unit systems )calculation in large power systems? how to get the base for voltage and power in generator, transformator and transmission lines?

1905


Define unilateral circuit?

795


what is basic difference betmeen normal & flame proof motor??

1735


How shall i select the value of capacitor or inductor in a system?

1536


Explain about Dubai electrical sysaem? Explain about Dubai drinking water system? Explain about Dubai Burj tallest building Electrical,Water.etc.. maintenance system?

1778


what is the efficiency of thyristor

1213


Dear sir, How to calculate 3.5 core pvc aluminium armoured cable meter wise carrying amps rating.Please give the solution with a good example.

1415


How many sprinklers should be in one pipe line?

1528


Load transfer in 11kv double busbar switchgear - operation.

1598


what r the checklist while installing a 380 kva DG set

3404