Answer Posted / fazil
the total quantity of concrete in stair case = (volume of each stair X total no of stair) + Volume of flight + volume of landing .
and quantity of steel can be calculate by using formula
(Dia X Dia) / 162
| Is This Answer Correct ? | 24 Yes | 7 No |
Post New Answer View All Answers
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
how to calculate steel for slab or footings?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
What is modular elasticity?
what is modular brick and it size
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
What is the ideal size of the living room ranges from small to large size?
what is the weight of 12mm aggregates?
What is meant by cad?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
what is moment-curvature relationship in semi rigid connections??
how we can find sieve #4 is 4.75mm?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
load combinations how many types for staad design purpose?