how to calculate quantity of cement and sand for plastering works in CM 1:6 proportion.....plz answer anyone.....and write the formula...
Answer Posted / raheel aamir
Ratio 1:6
Cement =1/7=.143
Dry To wet =1.27*.143=.181
Weight in KG = .181*35.31*40= 256.25KG
Wastage factor @5%= 256.25/.95= 269.74Kg
Sand=6/7=.857*1.27=1.089*35.31=38.437/.9=42.71 Cft (Dry to wet =1.27, Wastage Factor= 10%)
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
how to stop beam concrete between column
whats is difference between anchorage length and development length
what is anchorage length,lap length and (dont remember the last one)
How cracks in concrete can be avoided?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
Define What glue is least sticky?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
what is grade intersection?
How to find beam R/F cutting length
Why is the statue of liberty made of copper?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?