How do we come to know the Source data/file is
ready/Updated in the source location, when the session is
scheduled for @12:00AM and ready to run its job ? or Can we
schedule the session, when the source is updated in source
location without any time constraint?
Answer Posted / dr
It all depends on the Organisation to Organisation which
uses different softwares (Control-M is one of them). The
job will be triggered based on the notification message
= 'Y' when the Source file is ready or else it will have a
status = 'N'.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How might you approve all mappings in the archive all the while?
In informatica workflow manager, how many repositories can be created?
What are the types of presistent cache in look up tr.
Explain pushdown optimization $pushdownconfig parameter - informatica
Write the different tools in the workflow manager?
Differentiate between joiner and lookup transformation?
Which version configuration tool used in ur project?
What is data transformation manager process?
I have 10 columns in a flat file and 10 rows corresponding to that columns. I want column number 5 and 6 for last five records. In unix as well as informtica.
Explain lookup transformation is active in informatica
What is olap (on-line analytical processing?
what is Active lock explain
can you please explain me pre session and post session options?
What is Story point Estimation ? Can any one give just an introduction about this ? Advance Thanks
What are the measure objects?