Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is pile foundation?

Answer Posted / joe

Piled foundations can be of various types. They
can be used to transmit the loads from the foundations
through weak, compressible,
or unstable strata, to firmer ground beneath (end
bearing piles). In
clay and other cohesive soils piles can be used to
distribute the loads
into the ground through the friction forces along the
length of the pile
sides

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?

2720


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

11615


What is the per cu. mt. price of ready mix in Gujarat region.?

2360


What tor stands for in tor steel?

1082


how i convert mm into standard wire guage (SWG)no.

3068


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

2485


How many cum of 9.5mm stone in 1 ton ?

2536


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2634


which formula used for calculate the area of segmental arch?

2824


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2144


What are the RISKS during the project construction?

2296


What do you mean by bond? What are the different types of bonds?

2240


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1678


How many square meter can mason layout chb per hour

2272


sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you

2456