Answer Posted / k7
IT IS A PART OF STRUCTURE CARRY A LOAD TO TRANSFER THE
COLUMUN
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
What is the use of offset command?
what does the track parameter mean in staad.pro?
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
how much one carpenter can doing shuttering of slab in one day
how much tempareture are required to make liquid state of pid leed
Please design 12.5m long dubbly beam
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
Types of column foundation and how to calculate its steel quantity.
What is Density of cement, sand & aggregate ?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
What is the compressive strength of fly ash bricks?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
how much cement and sand required for 1cum rr masonry
What is meant by cartesian coordinate system?