procedure to calulate the how much bag of cement is used for
M20 grade?
Answer Posted / ranjan
M-20=1:1.5:3
COSIDER 10CM
1+1.5+3=5.5
15.2/5.5=2.76 FOR 10CM
1CM=0.276
CEMENT=.276X1440=397.4 ROUND 400KG
400/50=8 BAG
SAND600=KG
METAL=1200KG
WATER=200LTR
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
What is a hatch patterns?
what is the steel difference between np-2 and np-3 pipes and weight also
what is raft foundation
How high should the water tank be to provide a 60 psi at base of this water tower?
what is the formula to find the diagonal shape stirrups?
what is project?
How many square meter can a worker/labor demolish a structure per day?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
What is meant by cartesian coordinate system?
Explain creep?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
I want to join bhel because
what isload waring calculation