what"s the M book?

Answer Posted / k s k chakravarty

M.Book means Measurement Book. All the measurements of a
work are to be recorded in it. The M.Book normally contains
100 pages and issued by Executive Engineers certifying the
person to whom issued. It consists of the following columns.

Date of Description Nos L B D/H Qty. Rate Amount
recording

Is This Answer Correct ?    43 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate MR 9(derivation)

2313


What is the difference between engineering stress and true stress?

652


What in bending moment, if a moment is free end of cantilever beam?

712


Why should pumping be not used in case of concreting works?

989


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1804






what are the types of dimensioning?

1731


Explain the difference between slab and beam?

664


what mean By core Billing

1866


In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?

638


plz.show development and anchorage length in simple diagram.

2098


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

1542


What is chemical composion test

1506


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1274


how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

1658


why we are using stub column..? is it possible to construct steel stub column..?

1514