Answer Posted / murali
First define standard parameters in OP19 and define
formulas in OP21.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What happens to plan after it has been converted into production order?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
Difference between standard cost and variable cost.
What are the levels of batch, explain batch determination process?
what are the constraints of Variant configuration?
Mention how mrp (material requirement planning) types are classified?
Explain why their is need of production version ?
How costing is affected the pp?
Difference between base unit of measure, production unit, order unit
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is the use of mrp pp evaluations?
what is alternative item group
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
How can I use variable size items?
What is MRP Profile and MRP Group?