when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
is concealed wiring a problem in fly ash brick wall?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
what is Short bored pile foundation.
what is detail procedure of eccentric footing? plz. give solved exmple?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
why we use 19x9x9and 20x10x10 but not other
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
what is called the inverd level of mabhole chamber?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Aptitude, reasoning, quants, verbal and technical question
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
what will happen if one could not properly follow the spacing of slab reinforcement bar?