i have 5 session (s1,s,2,s3,s4,s5)i want to execute first 4
session after 5th session how will you do?
Answer Posted / chiky
connect the 5th session as first from start task and rest
of the 4 sessions followed by 5th session.
check fail parent option in first(5) session.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is granularity,what type of granularity we will take in fact tables either lowlevel or highlevel,if two tables having same granularity that is posiable or not
What is parallel processing in informatica?
Slowly changing dimensions, types and where will you use them
Name at least 5 different types of transformations used in mapping design and state the use of each.?
explain abt ur project architecture?
What are the different lookup cache(s)?
How to partition the Session?
What is sorter transformation?
Can one use mapping parameter or variables created in one mapping into any other reusable transformation?
How to create the list file having millions of flat files while indirect loading in informatica? In indirect file loading, suppose we have less no.of flat files then we can enter files names manually in list file creation. If millions of files are there, how can we enter the flat file names in list file?
How can a transformation be made reusable?
What are the different transaction levels available in transaction control transformation?
What happen if you have 3 ports in SQ and 4 ports in SQL override of SQ( provided all ports are in same order and they are connected with proper source and target)? Also what happens when I have 4 ports and will extract 3 values in SQloverride.. What will be the value in 4th port ?
Define pmcmd command?
Explian the Process of deployment groups in informatica