What is the Lcm of root2 and 2?

Answer Posted / thenmozhi

2root2=rooot2

Is This Answer Correct ?    4 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Travelling for 9 days. total dist to be covered is 1080 miles. Dist covered per day must be 20 miles then that of previous day. what dist is covered

853


Find the next number in the series 12,21,,112,121,122---

829


There are two candles with different thickness, but are of equal length. The thicker one lasts of six hours and the thinner candle last for 2 hours less than the thicker one. Suresh lights the two candles at the same time. When he went to bed he saw the thicker one is twice the length of the thinner one. For how long did Suresh light the two candles.

695


If each of the numbers A, B and C are divisible by 2, then A*B*C must be divisible by

760


find R,M,(..),F,D,(..)

769






What is your objeective in career ?

1943


the program requires 4000(n)1/2 [ie square root of n].if size of program was increased by 1% then calculate the percentage change in size of program.

890


Which of the following fractions is less than 1/3

693


The price of sugar increases by 20%, by what % house-wife should reduce the consumption of sugar so that expenditure on sugar can be same as before

716


A son and father goes for boating in river upstream . After rowing for 1 mile son notices the hat of his fathe falling in the river. After 5 min. he tells his father that his hat has fallen. So they turn around and are able to pick the hat at the point from where they began boating after 5 min. Tell the speed of river.

720


A bus started from bustand at 8.00a m and after 30 min staying at destination, it returned back to the bustand. the destination is 27 miles from the bustand. the speed of the bus 50 percent fast speed. at what time it retur4ns to the bustand

782


mukesh and anil ambani invested amount in business and made in the ration 17:13 and made some profits. if mukesh earned 800 rs more than anil. then what is the profit they have earned....?

5549


A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)

727


33 1/3 of 101 + 296 is

938


Want to get some material for apptitud e for banking preparation

2207