What are 4 parameters between node A and node B, to bring a
PCM link up between them.

Answer Posted / guest

Hi All,

PCM is up only by connecting cable both side in RJ45
connector. However to configure signaling link we require
below parameter
1.opc&dpc
2.SLC
3.TS
4.Network Indicator

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the postec controllers and how it is work

2439


What is the name of the occupational health and safety act in NSW

1976


What is the role of health and safety committee

2253


Hi friends,could sombody plz suggest me the website of History with audio (which can be hereable)plzzzzzzzzzzzzzzz help. Because i m going to appear WBSSC exam very soon its improtent.Plz send me to (mahato_hira@rediffmail.com)

2283


What is optical character recognition?

2478






What is the role of a health and safety representative?

2029


What is non verbal communication?

2120