What are 4 parameters between node A and node B, to bring a
PCM link up between them.
Answer Posted / guest
Hi All,
PCM is up only by connecting cable both side in RJ45
connector. However to configure signaling link we require
below parameter
1.opc&dpc
2.SLC
3.TS
4.Network Indicator
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is the postec controllers and how it is work
What is the name of the occupational health and safety act in NSW
What is the role of health and safety committee
Hi friends,could sombody plz suggest me the website of History with audio (which can be hereable)plzzzzzzzzzzzzzzz help. Because i m going to appear WBSSC exam very soon its improtent.Plz send me to (mahato_hira@rediffmail.com)
What is optical character recognition?
What is the role of a health and safety representative?
What is non verbal communication?