Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS THE DIFFERNCE BETWEEN AIS AND GIS IN SWITCH GEAR?

Answer Posted / janardhan reddy

IDENTIFICATION OF ERRORS IN GIS IS IS DIFFICULT AND IT WILL TAKE MORE TIME WHEN COMPARED TO AIS

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

With a phasor diagram show the effect of increasing the field current of a generator supplying a constant real power and connected to a grid system.

1967


How can get elongation of 2 k.G aluminium, if elongated aluminium dia is 2.5 mm?

2291


explain me the relation between torque, frequency,speed,voltage and current in the 3 phase induction motor?

2241


why should the primary of transformer be connected in delta in a heat run test?

1971


two phases with neutral supply can be taken in 3C X 10 sq.mm cable .

1415


How will calculate losses in an multi core Aluminium LT cable of different sizes & upto what length we can use a LT Cable ?

2139


Make a list observation on Transformer?

2423


how to calculate transformer turn primary & secondary side 11kv to 420v

2192


sir i have cleared the apti test of EIL held on 15th march and my interview will be in new delhi on 2nd june.i will be very much helpful if u help me regarding the type of interview questions comes at EIL.(URGENT.........PLZZZZZZZZZZ...............)

2045


Is RTCC panel needs any control supply.

2039


Advantage of LT panel vs HT panel

2918


IN MY SYSTEM THERE IS ONLY OVER CURRENT EARTH FAULT RELAY IS AVAILABLE. FOR THE UNBALANCE SENSING IS THERE ANY RELAY IS AVAILABLE? THE SAME CTs WHICH ARE USED FOR THE OVER CURRENT EARTH FAULT RELAY CAN USE FOR UNBALANCE ALSO?

4121


how are reversing the direction of dc motor

1645


grr resistance & contrator malt continuous

2137


A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.

1900