why u want to work in sail/ntpc as u r already in an it
company where life is good, good environment no much
tensions etc?
Answer Posted / mahtwog unbarp s
For an IT company, Electrical engineers are not required
but IT engineers do.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
what heppend if we are connected u1-v1-w1 as a star point in the place of u2-v2-w2 in power genration
Why the magneti fields are not passes from southpole to north pole
how many single tension hardware are required on a double circuit transmission tower?
any one please tell taht what type questions will be asked in BHEL interview, i am having interview on 24th Dec, please send this to mail pradeepsistam@yahoo.co.in
what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero
If a current -8+6sin6t is flowing three ammeter, one is a centre zero PMMC meter, one is true rms meter and one is moving iron meter. What are the reading of these three meter respectively?
If Neutral Grounding Resistor (GR) failed/shorted. Is it repairable.
can you send me the placement papers of electrical engg. from companis like NTPC,DRDO,IOCL,HPCL,BPCL etc.?If,plz send as soon as possible.Thanks.
What is Servo Ventilated Motor?
why constant voltage transformer should be start without load? and if started then what will happen?
What is the formulae of Megger value for a A.C.Motor
salam,hi, i need to know what the spesification of 300amp msb...
Explain the propagation of harmonics in the network and influence of phase angle of harmonics.
please send me last 5 year interview questions
is it possible to turn on the single phase star delta on delay timer using 24 v dc ?