Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

DLI Vs BMP

Answer Posted / joshna

DLI- it is Batch processing.
BMP- batch message processing(why batch message? - actually
messages are inputs for online processing but it is a
special type of batch processing whose inputs can be
messages some times/ batch job that runs in an online
region)

there is no point of test,dev or prod for these both tyes
of processing possible in production also
IMS online region will be down when batch processing DLI is
goin on( usvally batch schids run at night time)
BMP processing happens only when MPP regions are running
some times it is possible that BMP processing can run even
though no active MPP region is running

Practical example of BMP:
from morning till evening there may be many onlin
transactions occuring for a particular system.
each transaction updates or modifies database seperately.
instead of allocating locks to database resource all the
changes to database are captured on flat files and at end
of day when onlines are going to shutdown a BMP job is run
with the above said file as input to update all changes to
database at once(specific for a particular system)

Usvally BMP's are run before onlines shutdown.


Correct me if i am wrong

Is This Answer Correct ?    8 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define pcb?

1041


What is the maximum number of fields allowed per segment and what is the maximum number of fields per database?

986


Explain the processing modes available in ims db?

3565


What is psbgen process?

1116


What is dbms in ims?

1004


What do you mean by hierarchical database?

1121


What is the maximum number of pcbs allowed in a psb?

920


Explain psbgen process?

1101


how to create a changeman read only audit and update only audit Specifications for the Read only Audit 1) Read HFFD database unqualified. 2) Read FDRT, FDDM, FDAP segments. If FDAP-APP-STS is ‘2’ read the FDAV segment and get the FDAV segment which has FDAV-APV-OPTION as ‘X’ If FDAP-APP-STS is ‘5’ read the HFAC database. Read the ACRT segment qualified based on the key obtained from the FDAP segment from HFFD database. Conditions for writing into output file: a. App Type should be NEWR b. App Status should be 1, 2 & 5. c. Write 50 records per app status. For e.g. first 50 records for App status 1, 2 & 5 each The output file should contain the following fields from the database FDRT-COMP-CTRY-CODE X(03). FDRT-CUST-ID-NUM X(10) FDDM-DEM-SEQ-NUM X(01) FDAP-APP-SEQ X(02) FDAP-JNT-IND X(01) FDAP-APP-STS X(01) FDAV-APV-OPTION X(01) FDAV-APV-DT X(06) FDAV-APV-AMT X(07) ACRT-ACCT-NUM X(06) ACRT-SEG-BUS-TYPE X(02) ACRT-NM1-LAST X(19) ACRT-NM1-SS X(09) ACRT-NM1-1ST X(12) ACRT-NM1-INIT X(01) ACRT-NM1-SFX X(03) ACRT-NM1-TITLE X(02) PSB – DVAN2BMP In case you get a GE for any of the conditions, write to output file along with the details of the database segment which was not found. We need to complete this whole process by tomorrow. Run the audit in DLI mode. 2) Sort the output file created in step 1 on Cust ID, Dem Seq & App Seq. Specifications for the Update Audit 3) Take the output of step 2 as input for an update audit. Details are as follows: Read each record & check the app status. If app status is less than 2 then update the FDAP-NEW- MONEY-ENT to $25000.00 PSB - AUDBMPJ The job would be a BMP job. The test job would be run in IMSE region. Note - The proc (which will be called by the job) and the job should also be present in the change-man package itself. You’ll have a test job in your PDS along with overrides to execute the program in test regions. The job would be a DLI job. The test job would be run in IMSE region. It’ll have the following steps. 1) Delete-define output and error files. 2) Use a copybook for the output layout.

3603


What are the main control blocks available in ims db?

1034


What is the maximum of key fields and search fields allowed in a segment?

950


What are the retrieval sequences in ims db?

1305


Explain the maximum number of pcbs allowed in a psb?

3551


What is psb?

983


What are the two ways in which dl/i interface can be invoked?

892