What should be percentage of silt content in sand?
Answer Posted / satheesh kumar
sand silt % = 8%
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
can i get hindi version of is codes based on civil engineering?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
What is an ortho mode?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
types of laps in column
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
How to take labor charges for construction of 1cum of concrete?
Define What materials were used to build the Golden Gate Bridge?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
explain the advantages of total stasion
For what building Built-on balconies are preferable? What are the advantages?
plumbing CPVC fitting FTE Brass full form
what is the type of earthing