Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the difference between C-Curve and D-Curve for
MCB's.

Answer Posted / sean foley

answer 11 is pretty much right.
A basic rule of thumb is
B - beyond normal lengths (for very long cables)
C - common (normal) installation
D - Demand on start-up (high initial "rush" current on
motors / heat pumps)

Is This Answer Correct ?    4 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why collecting electrode of ESP to be earthed

2103


hey guys i scored 910 on GRE and 67 on TOEFL respectively.I have an aggregate of about 74%in my B tech.For which colleges should i apply for an MS program in electrical engineering.I am looking for colleges in NJ,SC,NC,GEORGIA, NY. Please reply with a good response.....

1928


Give some differences between open loop and closed loop?

1077


why voltage form factor of PT are increase , when it is ecpected heigher spikes in system. how it is calculated.

2102


give some advantages and disadvantages of combiniing the session, presentation, and application layer in the osi model into one single application layer in the internet model

2665


What will be the voltage regulation of a full load and 0.80 power factor lagging load transformer when a two winding single phase transformer has a voltage regulation of 4.5% at full load and unity power factor?

1188


what is ic 01,ic 06 ?is it types of cooling?

4273


When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number

2121


how hazordious area is classified at an oil & gas plant and categorise suitable class of electric equipment in that area like induction motors, LCS, Lighting Fixtures Fluerescent/Flood lights Mercury& sodium lights, J.Bs, Power Cables etc

1809


Define filter?

1075


What is core CT & it's function?

2039


As per the Anchor capstan motor specification, full load current is 200A. starting current is 1750 A and acceleration time is less than 8 seconds. Please guide for selection of cable size.

1816


What would cause a 240v choke that should give 110v out on a 16w lamp to gradually increase to 160v?

2134


what are all types of cross section in AC cables?

2250


what is the difference between RMS & TRUE RMS VOLTAGE

2894