why u want to work in sail/ntpc as u r already in an it
company where life is good, good environment no much
tensions etc?
Answer Posted / guest
good work profile means for electrical and mechanical
engineer it is useless to work is software where your core
knowledge is never used.
and to hte interviewer you should say only about work
profile and job security.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
design of IGBT firing circuit for 11KV
After completing iti in electrician, how can i get certificate of electrical supervisor? What ia requirements. For it?
we have consol make 3 phase servo stabilizer for cnc m/c. while installing the earth neutral voltage is 1.7 volts at stbilizer off condition and when stabilizer get on en voltage reaches 4.8 volts (new earthing is done and neutral is helthy condition all phase to neutral volts 440,442,441 v)why this happen.solution for cause.
Name one of major transformer company in KSA ?
if i am in front of transmission line how to know that current direction without any equipment
sent to a site and asked to explain how you would like a twenty seven flour building should be supplied with lighting and sockets plus a water boiler.
oltc of a transformer, how it works? and what are the equipment consist of describe briefly?
When and where resistance earthing is used ? How to calculate the time constant for earth fault
what is the effect of higher value of GD???
Tell me in detail about c.t. And p.t. ?
there are cam operated switches - why we call cam operated , What is cam ?
what is the difference between rectifier and converter and commudator?
in our all power plant have connected in grid and grid voltage and plant voltage is same, but as per as electrical concept the power will transmit from high potential to low potential but here altough same,then how power transmit from power plant to grid.
sir i have cleared the apti test of EIL held on 15th march and my interview will be in new delhi on 2nd june.i will be very much helpful if u help me regarding the type of interview questions comes at EIL.(URGENT.........PLZZZZZZZZZZ...............)
what is the formula for calculating the phase clerance between two phases and phase to earth how to calculate the cable for a motor