Answer Posted / unknown
1. Yes you can do pop on wall, ceiling or where ever u want but seepage can spoil it so i think no one can replace plaster.
2 you can do fix ceramic/ vitrified tile on wall, ceiling or where ever u want but it cost too much.
3.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What is meant by cartesian coordinate system?
What is passive earth pressure ?
How to calculate steel for beam slab and column
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
what are the Task work of different labour.?
will fix foundation bolts at site with out template is there any procedure?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
Describe a time when you anticipated potential problems and developed Preventive measures
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
Permissible wastage of cement as per IS code ? In which IS code I get it?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?