Hi Dudes, I have completed B.E Civil with two years
experience in Highway& Bridges. One year experience in Site
field & One year experience in Planning & Billing Dept. I am
willing to work in abroad, i am having passport and all..So
if anybody knows about foreign vacancy pls inform
me..Ph:9994050979 & Mail Id: Simacivil1988@gmail.com

Answer Posted / rahul

Just be sensible

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

detailed calculation of the amount of cement used?

1634


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

1749


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

1734


will fix foundation bolts at site with out template is there any procedure?

2169


can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density

1704






how much cement and sand consuptin in 4 inch siporex walls 100 sq ft

2510


What is the origin of name railway sleepers?

844


howto calculate the quantities of material used in fly ash brick after finding the volume??

1178


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1263


How much cement,sand,bricks and water needed for 1square metre brick work?

1344


what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete

1879


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

983


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

1510


how much quantity of cement,sand and water required for 1 sq feet flooring work .

1999


what is castigliano theaorem

1835