Answer Posted / k.k
ISIS:875 (part-1,2,3,4) :456-2000 SP:16 SP:32 SP:34 SP:6 IS:800-2007 IS:10682 IS:383 etc.....
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
Why should you show Client/Engineer activities clearly on the project plan?
what is thumb rule for calculating the size of ISMB required for a particular length of span
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
Civil engineering material testing Standard results
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
how to prepare site mix design
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
Why nautical mile is different from statute mile?
What are the advantages and disadvantages of lead products in construction?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
I need old MMUP exam question and answer for Civil engineering
Basic questions of civil engineering
how to calculate rate analysys of 1:6 plastering 10 sq m