Answer Posted / rajkumar arya
The ratio of the volume of voids ( Vv) to the volume of the
soil solids (Vs ) OF THE GIVEN SOIL MASS, IS CALLED VOID
RATIO & denoted by e mostly expressedin %.
i.e. e= Vv/Vs e=( Vv/Vs)*100 %
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
pls mail some more tecnical qustions at msaranya2610@gmail.com
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
how to calculate rate analysys of 1:6 plastering 10 sq m
what is Brest Wall?
When was the first motorway built in england?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
punj loyed and sapurjl palanjl
How to find out kg per Sft ?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster