Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / kanawar

To control steam temp when flue gas temp is vary.

Is This Answer Correct ?    19 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1999


What is LB-SR.

2589


By any way can we increase the B check hours from 300 to 500

1797


what is the difference between compensated & normal drum level in boiler drum?

1364


can dp type level transmitter work in under vaccum condition

1629






How do you consider that you can improve and what assistance do you need to achieve this

1415


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

618


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2175


operation

1476


what's the moog valve

1134


what is the trip circuit supervision in an electrical meaning?

1549


How to calculate power press toneage

1649


what is restricted earth fault explain in details

1707


what is the basic use of power plant in equipment

1312


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1307