ROUTING:-
ROUTING IS NOTHING BUT LIST OF / SEQUENCE OF ACTIVITIES WHICH ARE REQUIRED TO PERFORM TO PRODUCE ANY PRODUCT
RATE ROUTING:-
RATE ROUTING also same only thing is U cannot provide setup time and alternate sequence in Rate Routing.
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Overlapping and splitting, where do you assign?
How to delete a group of products that was created in screen mc84 ?
What does the use of ms70 followed by mcec get you?
What is the planning horizon?
Explain the mrp group and their uses.
What is the transaction code to run MRP for sales order?
define variable cost
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What are the MRP master data?
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
what are the settings needed for variant configuration?
Explain PI sheet.
Explain variant configuration
What is Material status and which view of the material master it is available?