Answer Posted / guest
10.76
| Is This Answer Correct ? | 0 Yes | 7 No |
Post New Answer View All Answers
what is the criteria for the finalisation of pavement thickness in road project?
What are the common ways of demolition?
Why Vitrified tile are getting pop up.
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
what is the maximum number of course that can be laid according to IS code and the max height.
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
RR masonry rate analysis
What is the distance between railway tracks?
for pretensioning which will yield first and same for post tensioning?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
How to find out kg per Sft ?
significance of specific surface area of particles?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
What is the purpose of Chipping in the heavy foundation?