What are mandatory fields for PP configuration
Answer Posted / rosy
mandatory fields of SAP PP configuration are
1-plant parameters for mRP(0ppq)
2-creation of order type(opjh)
3-order type depended parameters(opl8)
4-scheduling profile(opkp)
5-assign number range for odrers(co82)
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
Mention what are the t-codes for creating, changing and summarizing bom?
Difference between MD01, MD02 and MD03.
What is planned consumption and unplanned consumption?
Explain LTP.
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
Difference between different strategy groups.
What is the difference between indian and us payroll?
What do we do in the realization phase?
Explain the mrp list and their uses.
In cost controlling information system mention the fields that are listed in the list screen of the report?
Differentiate ‘variant bom’ from ‘multiple bom’?
What is Phantom Assembly?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
What is Inspection Points?
Tell some standard order types and what configure done for current project