Prepare a Schedule for a Highrised building from starting stage to Handover?
how to disign cuplock shuttering and it's matireal requirement snd any related web site
What does a construction cost covers and what does not?
What are the different theories of failure under static load?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
what is anchorage length,lap length and (dont remember the last one)
how to calculate the length diamond shaped striupps in column
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
what is the type of earthing
What is difference between limit state and working stress method? How it is applies in building structure.
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
How to compute minimum number of columns required for a site from area of site?
what is the ingredient value of 40mm and 20mm aggregates?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm