Answer Posted / rick
It is the link between receipt and issue.
Is This Answer Correct ? | 6 Yes | 11 No |
Post New Answer View All Answers
What is the Difference between TECO and CLSD?
What do we do in realization phase?
Can't one material be assigned to more than one operation in a routing, why?
Splitting of production order & product version
What is mrp controller means?
What is opening period?
Which MRP types you have used?
Explain the Difference between the Discreet and REM.
Explain 'mrp' (material requirements planning)?
In the monthly lot size proc, how to generate lot at the end of Period?
Difference between MD01, MD02 and MD03.
What are all the settings done for configuring the integration of pp with fico?
Mention what are the types of master views for production and planning?
Explain Flexible Planning procedure or How many levels of Flexible planning.
Difference between standard cost and variable cost.