At which place Construction joint should provide in slab
and Beam at the time of casting.
Answer Posted / ajit bidwai
L/3 of span.
| Is This Answer Correct ? | 15 Yes | 2 No |
Post New Answer View All Answers
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
Sir how to find cutting length for footing steel bars in the shape of "u"
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
What is the standard volume of pharma in cub ft
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
1m square 20mm plastering how much of water need curing work
What is difference between engineering stress and true stress?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
What is soil enforcement?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
Explain major difference between auto level and dumpy level?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
How do you prepare Material Recovery Statement for deduction from contractors bills?
Write short note on construction programme for pile foundation.
What is the withdrawal force of steel nails?