what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?
Answer Posted / vigneshwaran s
Generally its easy to find it.
Find Total Parts = (1+2+4)=7 Parts.
For 1 cu.m of concrete the total parts = 1.57
Unit weight of cement = 1440 kgs
Cement = (1440/7)*1.57 = 322.97/50kgs = 6.46bags.
1 bag cement= 1.25cft
Sand = 6.46*1.25 = 8.075 cft*2 =16.15 cft
Aggregate = 8.075 cft*4 =32.3 cft.
Thats all...
Result:
Cement = 6.46 bags
Sand = 16.15 cft
Aggregate = 32.3 cft.
Regards,
Er.Vigneshwaran S
Is This Answer Correct ? | 5 Yes | 9 No |
Post New Answer View All Answers
may i know the detailed description of cutting length
what are the code used for residental building?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What applicable rate of wct in bihar
What are the materials used in building a gravity dam?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
what is the theoritical percentage of concrete cubes testing per day?
Why nautical mile is different from statute mile?
all technical question
what is Brest Wall?
what is the difference between tsp & tower
What is OSHA compliance?
What is an ortho mode?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?