deshuttering time for RCC wall & column

Answer Posted / bala.divya

16to24 hours

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what does the track parameter mean in staad.pro?

5608


What is the diameter of the 3"inch nails?

1616


Define a polyline?

795


TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?

1799


Minimum and maximum size of the building components

1866






how to calculate MR 9(derivation)

2433


How many Sft of Level Plaster per Kg

1209


what is a well

1603


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

2960


What is the Maximum %age of Steel in columns and beams ?

831


how to check and keep control on the wastage of material at site

1953


How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1571


In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?

1589


how to control PQI (Project Quality Index)

10020


How to determine thee cut length for steel reinforcement bars in R.C.C design

1153