Answer Posted / laxit
Question is wrong, Now a days, PLC with mega expansion
capacity is available. One need to check the scaning time
requirement and avaiblity isues pertaining to process
For a large system DCS system for control is acceptbale
however for safety function there shall be PLC (ESD)
system. In case of small application where as PLC can work
as safety and control purpose shall employed.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
DEAR SIR/MADAM MY NAME IS ARKAPROVA BHATTACHARYYA.I AM A FRESHER INSTRUMENTATION ENGINEER.CAN YOU PLEASE SEND SOME QUESTION PAPERS OF GRADUATE ENGINEER TRAINEE EXAM OF DVC(DAMODAR VALLY CORPORATION).MY EMAIL IDs ARE arka_aec@rediffmail.com.
who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.
steps for installing orifice plate?
dear sir we have insatlled positioner model no.sipart PS2 make Siemens at our control valves . now problem is if we want to increase the response of valve opening speedy /fast. what parameters do we change for positioner ? any idea. please guide us.
use of split range ? where it is used ? in which control loop it is used ?
kindly sent some demo question and answer
How to measure the dust in chimney(spm)?
WHAT IS THE CAM POSITION IN CONTROL VALVE POSITIONER ? WHY IT IS USED?
How to calibrate Field bus transmitter? procedure ?
how to calibrate 0- 150 psi presure gauge by dead weght tester
can u briefly explain aboutan aryton shunt multirange DC ammeter?
I want to buy a seal kit of a pneumatic power cylinder.But I don't know it's specification.So please help me to know its specification.
In turbine what does term CDP, NI, NH, HSSOC means.
What is the reason PT speed not incresed in gas turbine?
Explain an adaptive / self-tuning controller’s major draw card.