how much cement consumption in 1 sqmt of wall cleading work
(dedo)?
Answer Posted / sanchit guleria
thickness of neat cement layer is 1.5mm.
so cement required for 1sq.m= 1*0.0015=.0015cu.m
dry vol. of cement increased by 25% so (.0015+.0015/4)=.001875cum=.054 bag=2.67kg of cement
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
in 100 cft = 1350 bricks in 100 cft = ? bloks
what are the Task work of different labour.?
What will you do if you encounter problems like accidents?
what is mean by reestimation?
how to clculate the %of concrete strenght achive after curing?load
What quantity of 1.0 m3 bricks required?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
What do you mean by tolerance factor of concrete ?
Why should pumping be not used in case of concreting works?
What is a kip?
Define polar co ordinates.
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght