how much cement consumption in 1 sqmt of wall cleading work
(dedo)?
Answer Posted / sanchit guleria
thickness of neat cement layer is 1.5mm.
so cement required for 1sq.m= 1*0.0015=.0015cu.m
dry vol. of cement increased by 25% so (.0015+.0015/4)=.001875cum=.054 bag=2.67kg of cement
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
what is the maximum number of course that can be laid according to IS code and the max height.
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
What is Rankine Cycle?
Difference between pre-tensioning and post-tensioning.
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
What is portland cement
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Explain the Strength of brick?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Design a rectangular channel.
What are wooden shingles?
what is education Cess.
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?