Management diagram of your project is–––

Answer Posted / sjtbehera

managment information system ( MIS)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm

1659


What is the largest concrete dam in the world?

692


60-70 grade of Bitumen is VG-30 ?

1678


what do you understand by M25 concrete

1932


What tor stands for in tor steel?

632






What Are The Steps Involved In The Concreting Process, Explain?

834


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

1653


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1359


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

1908


what is the calculation of raw material for 0.35cum of m-15

1048


how pumping of concrete effects the quantity of material used in it?

1299


howto calculate the quantities of material used in fly ash brick after finding the volume??

1184


What is Architect-Prepared Contract?

738


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

1878


how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2

1451