break down of electricity is more in summer or in winter ?
give reason
Answer Posted / rk
My opinion is that the supply is less & demand is more of
electricity in summers etc.That is what country recently
faced grid faliure.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how test transfomer(3 phase75kva) by megger
What is the automatic voltage regulator with servomotor?
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
To prove the capacity of a 10MVA transforemr with 6.5% impedance by a short circuit test how much power is needed to inject an impedance voltage if we have to arrive for its rated current?
why we use single core 630mm2 cable for transformer secondary side
ROC converges if pole and zero lies inside a) origin b) z=1 c) pole d) zero ? Explanation please? if ROC does not converges then?
Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason
WHAT IS LOAD CELL
How to know about the rating(voltage and other) of induction motor if its name plate is missing at the manufacturing site.
Do inductive loads have distorted current waveforms ?
What is transformation ratio what it describes?
Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.
plz send me the placement interview question and answers of whizchip(technical and apttitude)..i have an interview in next.
In EDO ACBs what is a purpose of closing coil and motor, what is the operation of these devices are they inetconnected. means if we give supply to motor and by BCS we charge Closing coil,what exact is operation is and how it charge a spring of ACB. Sir if anybody has an wiring diagram please send me the link to operate and EDO breaker.
i completed my DEEE. and i want to electrical c license. how to get it..?