Answer Posted / rockstar
ASAP means Accelarated SAP, this is the Standard
Implimentation methodology by SAP. This is 5 steps
1. Project Preparation
2. Busness Blueprint
3. Realization
4. Final Preparations
5. Go Live.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What are the pre requisite for the SAP Installation?
How many types of work processes?
How to check cpu usage in EP?
What are saplpd and tcp/ip print server and purpose? And difference b/w saplpd and tcp/ip print server?
What is your UNIX experience and the types of UNIX systems you have worked on.
what post steps and pre steps db refresh
What is luw (logical unit of work)?
Which table contains the details related to Q defined in SPAM? Is there a way to revert back the Q defined? If yes, How?
Where do you download trail version of sap ecc, what is sap cal?
I also wanna work with Webdynpros? What are the requirements? I mean SAP 4.7 ee or ECC 5 or 6? Netweaver developer Studio? Also with win 2003 i have the activation problem every month. SO do i get a cd that doesnt ask for the activation? i have win 2000 but can it be installed on HP pavilion laptops that are coming preinstalled with Vista OS?
What are common transport errors and their codes?
What is “data sets” in sap?
what can we do if shadow instance is down and getting up in prepare phase of upgrade
How to uncar car/sar files in a single shot?
Mention what is the difference between sdm and jspm?