how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???
Answer Posted / k c kumar
A conc. cube gains app 67% strength in 7 Day.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
How do you calculate the unit weight of concrete?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is the different type of slump test indications?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
How many cement sand ballast in cc 1:4:8 40mm
1:4:8 pcc calculation 591 cu.ft
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
mix design procedure for 1:6 cement mortar
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
on what basis the partial factor of safety are decided? form the load combinations
What are the Types Of DPC and its Thickness used?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil