you are a electrical student, why are you coming for
software job.
Answer Posted / tango
Why they have called for the interview if they dont require other than comp and IT people.
It is well known that clearing electrical is much tougher than
IT or computers.
| Is This Answer Correct ? | 10 Yes | 12 No |
Post New Answer View All Answers
what is the circulate the diesel in DG in side pls tell parts name and picture with circulate the diesel
1.why are not using acb 33kv ht side? is there any problem 2.what is difference between acb,vcb,sf6 breackers? 3.what is the function of invertor and convertor in ups?
Define demand factor?
How to protect a Dosing pumps/any sensitive equipment (single phase) from surge protection inside a food factory.
features of hbc fuses
'documenˁ
what is mean by descripiency relay? & wht is its ansi code?
Please elaborate th´evenin’s theorem?
what will happen if synchronous machine rotor fed from single phase ac supply
3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.
what is the necessity of under ground cables ??
WHY IS THE EARTH FAULT CURRENT ALWAYS LESS THAN THE NORMAL CURRENT??
If a rotary UPS is in line through grid power; What would be the impact on Power Factor if the load through rotary ups is 25% , 50% , 75% & 100%. Will the power factor reduce with less load?
what is the grounding Calculation formula? spouse i want to provide grounding to 3phase 18kw motor or i want to provide ground to 3phase 10kva dry type transformere or you give me any exemple...... Thanks.
List out the different frequency domain specifications?